Thursday, 25 April 2013
Wednesday, 24 April 2013
Tuesday, 23 April 2013
CONSTRUCTION Risk Assessment
Filming
Risk Assessment Form
Event:
|
Filming
of Motion Picture, Promise Me
|
Date:
|
Venue:
|
(1)
Activity /
Area of Concern
i.e.: what is taking place as part
of the event?
|
(2)
Hazards Identified
i.e.: what can cause harm?
|
(3)
Persons at Risk
i.e.: who could be harmed by the
hazard?
|
(4)
Current Risk Factor
(high, medium or low)
i.e.: determine the level of risk
|
(5)
Actions to be Taken to
Minimize each Risk
i.e.: what action can you take to
lower the level of risk
|
(6)
(high, medium or low)
i.e.: risk factor after action taken
to minimize the risk
|
Filming
of motion picture, Promise Me.
|
Trailing
leads
|
All
concerned
|
High
|
Warn everyone on set. Tape leads down. Use caution
cones.
|
Low
|
Filming
of motion picture, Promise Me.
|
Two-way
traffic
|
Main
character
|
High
|
Use
caution cones and hazard signs. All members of crew apart from main actors
are to wear high visibility clothes.
|
Low
|
Filming
of motion picture, Promise Me.
|
Trailing
leads, electrical equipment, and students moving around.
|
All
concerned
|
High
|
Corresponded
with prior to this event and that all measures are put into place for the
health and safety of students, cast, crew, and all members of staff.
|
Medium
|
Filming
of motion picture, Promise Me.
|
Damage
to filming locations i.e. homes.
|
Damage
to households..
|
Medium
|
Notify
all cast and crew of all hazards and items that can be broken. Ensure that we
have public liability to work in these locations. Most importantly, ensure
that the homeowners and property owners have insurance against property
damage.
|
Low
|
Friday, 19 April 2013
Thursday, 18 April 2013
Subscribe to:
Posts (Atom)